Assembly instructions for energy chain System E6-1

System E6-1 assembly Remove the opening cross bars by hand or screw driver. Repeat the process on the lower side
System E6-1 assembly Disassemble a total of 2 opening cross bars on each side to complete the separation
System E6-1 assembly Push the connection pin out using a screw driver. Repeat the process on the opposing side

System E6-1 assembly Rotate the Energy Chains apart until the interlocks between the chain links disengage. Repeat the process on the opposing side