In a waste disposal company in Belgium, the trailing cables in two overhead cranes have been replaced by our e-chains. The project was associated with several challenges: The cranes have to cover travel distances of 116 meters – their speed is 2.5 meters per second with an acceleration of 0.5 meters per s². Both cranes use the same rail line, so they require two long e-chains that run on top of each other in the same channel. These different stresses could only be inadequately coped with trailing cables. With energy chains, supplied as a completely pre-assembled readychain, the cable length could be reduced on the one hand, and the service life significantly increased on the other.

In this waste plant, the trolleys of two cranes move over a length of 116 meters.