Goldhofer AG is an internationally active transport company that specializes in the planning and implementation of difficult transport tasks and special transport solutions. As standard trailers cannot be used for particularly bulky and long transport goods, very special trailers are coupled to the articulated lorries. In this case, several wind turbine blades, which can reach up to 70 meters in length, were to be transported safely to their destination on the trailer. In order to allow these enormous dimensions, a flexibly adjustable trailer had to be realized. The solution: a 5-fold telescopic system that can be extended or retracted to the required length depending on the transport task.
Once designed, the guidance of the large number of cables also posed a major challenge in terms of realization. For the energy supply from the articulated lorry to the rear of the trailer, the system had to be able to reliably follow the up to 70 meter long journey, robust and safely allow the heavy cable package consisting of numerous cables for the energy supply.