Change Language :
For a single girder Goliath crane in 2010, one upper and one lower trolley each were equipped with one of our roller e-chains® as well as our chainflex cables®. Since one of the two e-chains® had to carry a cable weight of 61kg/m, additional chain bands were integrated. They permanently ensure a safe process despite the enormous load.
The operator also opted for the 5050RHD roller energy chain for the lower crane trolley. Here it moves a cable weight of 32.7kg/m

Customer Service:
Phone: Monday to Friday from 8 am - 8 pm
LiveChat: 24 hours
Book a Call
Book an Appointment with a Product Expert